Sep 2026· International Transactions in Operational Research· 0 citations· 37 references
TL;DR
Comparing the method against the top SPP algorithm, which minimizes layout overlap, on real‐world MRCAP instances shows that RKO yields superior remnant quality in almost all problem cases, demonstrating that minimizing layout width in SPP does not ensure effective remnant valorization, highlighting the distinction between these two optimization objectives.
Abstract
The diverse constraints of industrial applications lead to variants of two‐dimensional (2D) irregular packing problems that require tailored solution methods. This paper addresses a real‐world industrial challenge by proposing a new problem definition, the maximum reusable contiguous area problem (MRCAP), and a novel metric, the maximum contiguous area, to measure and maximize the contiguous unused area in a layout, thereby facilitating the reuse of remnant material. This study proposes an approach focused on optimizing placement policies. We develop a decoder, implemented within a new version of the random‐key optimizer (RKO) framework, that dynamically assigns the best placement rule from an 11‐heuristic portfolio. We validate our methodology on established literature benchmarks. Among the 15 benchmark 2D Irregular Knapsack Problem instances evaluated, RKO matched the best‐performing existing algorithm on 11 and achieved better solutions on the remaining 4. These results suggest that RKO is competitive with, and potentially superior to, this algorithm. RKO's results indicate that current benchmarks no longer adequately represent the problem, motivating the introduction of extended benchmark instances. RKO also outperforms leading 2D irregular strip packing problem (SPP) methods relying on constructive sequence search. Finally, comparing our method against the top SPP algorithm, which minimizes layout overlap, on real‐world MRCAP instances shows that RKO yields superior remnant quality in almost all problem cases. This demonstrates that minimizing layout width in SPP does not ensure effective remnant valorization, highlighting the distinction between these two optimization objectives.
The three-dimensional single bin packing problem with categorical compatibility constraints (3D-SBPP-CC) extends the classical NP-hard packing problem by adding pairwise incompatibility rules over item categories. Although such constraints arise in hazardous materials logistics, no prior study has provided a complete m...
Yi-Nan Jin, Zhao-Long Xuan, Tian-Peng Li et al.· Algorithms· 0 citations
The cutting stock problem (CSP) is a classic operations research problem with several applications in real‐world scenarios. It involves cutting large objects into smaller items to satisfy customer demands, minimizing the number of cut objects. Auxiliary objectives often arise when solving the CSP, with a common one b...
E. M. Silva, A. A. Chaves, M. C. Resende et al.· International Transactions i...· 0 citations
This paper introduces the Stochastic Clustered Team Orienteering Problem (SCTOP), a variant of the recently defined CluTOP where travel times are non-negative random variables. This problem aligns with the growing interest in prize-collecting problems and the challenge of optimizing routes under uncertainty. To addre...
D. Ferone, P. Festa, Tommaso Pastore· Annals of Operations Researc...· 0 citations
The Three-Dimensional Trailer Loading Problem (3D-TLP) involves determining the optimal placement and orientation of heterogeneous items within the confined space of a trailer while maximizing volume utilization and satisfying a wide range of complex logistical and safety constraints. The 3D-TLP is NP-hard, rendering e...
A. Del Río, L. Diaz, L. De Vicente et al.· 0 citations
The U-shaped Disassembly Line Balancing Problem (UDLBP) is a challenging combinatorial optimization problem for which efficient solution approaches remain limited. This study proposes an efficient branch-bound-and-remember (BBR) algorithm that integrates a memory-based mechanism and U-shaped dominance rules to effectiv...
Wan-Lin Yang, Da-Yong Han, Zi-Xiang Li et al.· Algorithms· 0 citations
Minimising the makespan for large job sets is the goal of the algorithmically intensive NP-hard permutation flow shop scheduling problem (PFSP), which is crucial for real-world applications. Originally designed for continuous optimisation, the snake optimiser is a recently discovered swarm-based metaheuristic that may...
Hassan Almazini, Salah Mortada, H. Almazini· Applied Computer Science· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.