BIM-iDT is presented, a BIM-Integrated Digital Twin framework that couples multi-source IoT sensing with an IFC-based BIM model to enable intelligent fleet coordination and automated progress control for smart construction in infrastructure engineering.
Abstract
Integratingartificial intelligence (AI), the Internet of Things (IoT), and Building Information Modeling (BIM) holds considerable promise for modernizing construction management, yet a unified real-time framework connecting these technologies for heavy civil earthmoving remains lacking. This paper presents BIM-iDT, a BIM-Integrated Digital Twin framework that couples multi-source IoT sensing with an IFC-based BIM model to enable intelligent fleet coordination and automated progress control. The research follows a design-science methodology comprising framework formulation, modular development, field deployment, and multi-project validation. The framework comprises a heterogeneous sensor fusion layer aligning GPS, IMU, fuel-consumption, and LiDAR data within the BIM coordinate system; a spatio-temporal graph attention network (ST-GAT) that recognizes equipment states and predicts short-horizon productivity by modeling fleet-level spatial dependencies; a temporal point cloud differencing module that quantifies cut/fill volumes against BIM design surfaces; and a constrained multi-objective evolutionary optimizer (CMOEO) that generates Pareto-optimal dispatch plans balancing fuel, cycle time, utilization, and schedule adherence. Validation on a highway project with instrumented machines shows that ST-GAT achieves a macro-averaged F1 of 0.943, volume MAPE stays below 3%, and CMOEO reduces fuel consumption by 12.6% and cycle time by 9.3% while maintaining schedule adherence above 96%, yielding an estimated 168-ton CO2 emission reduction. End-to-end latency averages 600 ms, satisfying real-time requirements. Cross-project transfer experiments on a secondary dam construction site further confirm framework generalizability, establishing BIM-iDT as a scalable paradigm for AI-and-IoT-enabled smart construction in infrastructure engineering.
As Building Information Modelling (BIM) and Construction 4.0 gain traction, tracking project progress in real time has become increasingly critical. Although Digital Twins offer advanced capabilities, their reliance on complex, bidirectional data exchange often hinders practical deployment during active construction. T...
B. Ravinder· Journal of Asia Entrepreneur...· 0 citations
A VN-tailored BIM–GIS workflow for as-built infrastructure modeling that standardizes data exchange using IFC and CityGML, harmonizes spatial data to the VN-2000 coordinate system, and automates semantic mapping via FME middleware is proposed and validates.
Construction schedule management is fundamental to the success of residential building projects, yet traditional approaches frequently suffer from information lag, fragmented data, poor multi-party coordination, and insufficient proactive risk prediction. To address these limitations, this paper proposes an intelligent...
Jin-Kai Zhang· Academic Journal of Science...· 0 citations
The continuing digital transformation of the construction industry has increased the need for construction-site management systems that can respond to complex, dynamic, and time-sensitive project conditions. Conventional management practices, which frequently depend on fragmented information, manual inspection, and del...
Shuai-Qiong Zhao· Archives des sciences: a mul...· 0 citations
The construction industry has been undergoing significant transformation in recent years, largely driven by the rapid advancement and widespread adoption of Building Information Modeling (BIM) and Internet of Things (IoT) technologies. BIM encompasses intelligent 3D modeling methods and management processes that enable...
P. Máder, Nándor Bakai, Tünde Jászberényi et al.· Műszaki Tudományos Közlemény...· 0 citations
The integration of IoT sensors into OpenBIM-based monitoring environments requires not only data acquisition but also the consistent organisation of sensor identity, semantic information, monitored variables, spatial context, and information exchange. This study proposes a four-stage OpenBIM-IoT workflow comprising pro...
Eduardo J. Renard-Julián, J. M. Olmos, M. S. García-Cascales· Applied Sciences· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.