Skip to content
Conference

Deterministic Delay Analysis of Periodic Credit-Based Input-Queued Switches under Bounded Arrival Jitter

Jul 2026 · International Conference on Computer Communications and Networks · pp. 1-6 · 0 citations · 16 references

Abstract

The rapid emergence of mission-critical applications has shifted network requirements toward strict end-to-end deterministic delay guarantees. While packet-switching infrastructures provide flexibility and scalability, achieving predictable delay remains challenging in the presence of arrival jitter caused by traffic shaper implementations, which are used to regulate packet transmission intervals, and initial timing offsets during connection establishment. This paper presents a theoretical framework for analyzing delay performance in periodic credit-based input-queued switches under bounded arrival jitter, where the jitter does not exceed the transmission period T. We prove that the maximum queueing delay is bounded by 2T when the initial offset Φ = 0, and by 3T during the pre-connection establishment phase, where the initial phase offset between the arrival process and the credit assignment is not yet fixed. Furthermore, we show that the probability that the delay exceeds a given threshold prior to connection establishment is upper-bounded by a distribution obtained via convolution of the Φ=0 case. Numerical results validate the derived bounds and demonstrate that the framework enables reliable worst-case delay estimation without exhaustive simulations.

View source

Similar papers

Open access 2026

Configuration of Cycle Duration in Cyclic Queuing and Forwarding

Cyclic Queuing and Forwarding (CQF) is a mechanism defined by IEEE Time-Sensitive Networking (TSN) for providing low jitter in a deterministic network. CQF uses a common time cycle and two buffers per node output port. During one cycle, incoming packets are stored in one buffer while packets in the other buffer are bei...

D. Guidolin--Pina, Marc Boyer, J. le Boudec · 1 citation
Open access Sep 2026

Packet-Level Adaptive Forwarding with Multi-Cyclic Queues for Time-Sensitive Networks Using Delay Slack

Time-sensitive networking (TSN) aims to provide bounded latency and reliable delivery for critical applications. Existing cyclic queuing and forwarding (CQF)-based mechanisms commonly rely on centralized flow-level scheduling, path computation, and resource reservation, requiring prior knowledge of traffic demands and...

Zheng-Bo Dong, Rui Han · 0 citations
Open access 2026

Delay Impact of Bursty Cross Traffic in Combined Input and Output Queued Switches Using Virtual Input Queueing Under Diverse Network and Traffic Conditions

Simulation results show that the CIOQ switch with VIQs effectively isolates critical flow from the impact of bursty flow originating from other input ports, thereby mitigating delay degradation caused by cross-port interference under the examined traffic conditions.

Takuto Kubo, Shingo Okada, Eiji Oki · 0 citations
Preprint Sep 2026

Analysis of Triggered Packet Streams: A Matrix-Analytic Method for Exponential Triggering Delays

In many communication networks, the transmission of a packet may automatically trigger the transmission of a subsequent packet from the same source after a (possibly random) delay, without requiring acknowledgment or feedback. Such behavior arises in multi-stage status updating, proactive protocols, and other applicati...

Mehran Rahnamania, M. Mandjes, Farid Ashtiani · 0 citations
Open access Aug 2026

Hybrid DQN–PPO control for joint queue management and bandwidth allocation under bursty network traffic

A hybrid reinforcement learning (RL) framework that jointly controls queue management and bandwidth allocation in bursty multi-service networks and demonstrates the effectiveness of coordinated learning-based control for stable and QoS-aware operation in bursty networked systems.

T. Khan, Babar Shah, Taimur Karamat et al. · 0 citations
Open access 2026

5G-Aware Incremental Routing and Scheduling for Dynamic Time-Triggered Flow Admission in Time-Sensitive Networks

: Mobile edge services require deterministic communication across Time-Sensitive Networking (TSN) and 5G access, where the standardized integration architecture exposes the 5G System (5GS) to the TSN controller as a logical bridge. We study dynamic admission of time-triggered (TT) flows using reported 5GS bridge delay...

Zhi-Hao Liu, Yi Zhang, Wei Zhang et al. · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.