Skip to content

3 papers indexed here

We haven’t gathered this author’s papers yet. Follow them and we’ll fetch their work.

Not the right person? Other researchers publish under this name.

Open access Sep 2026

Improvement and Acceleration of Rebuild and Conversion Process for ore Wagon at Grasberg Block Cave Mine PT Freeport Indonesia

The transition to wet muck-dominated production at PT Freeport Indonesia’s Grasberg Block Cave mine requires reliable conversion of dry-model ore wagons into wet-model units; however, delays in transportation and workshop activities have constrained production output. This study aimed to identify the root causes of ine...

Panji ' Adino, G. Yudoko · 0 citations
Review Open access Jul 2026

DEVELOPING A PROJECT MANAGEMENT MATURITY MODEL TO ENHANCE EXECUTION PERFORMANCE IN SOLAR EPC PROJECTS: A CASE STUDY OF PT TML ENERGY

PT TML Energy, an Engineering, Procurement, and Construction (EPC) company specializing in solar energy projects in Indonesia, experienced recurring project execution delays of 20–40% beyond planned schedules during 2021–2024. A review of project records indicated that these delays stem not from technical limitations b...

Iftikar Fadhlirohman Soeroyo, G. Yudoko · 0 citations
Review Open access Jul 2026

Integration of Lean Management, Agile/Scrum, and PMBOK in Improving The UAT Process (A Case Study of Banking Co.)

The results indicate that eliminating systemic waste could significantly reduce burnout risk and improve long-term team sustainability, and eight improvement operations integrating Lean Management, Agile/Scrum, and PMBOK principles were proposed.

Dedi Yusuf Hernanto, G. Yudoko · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.