Jul 2026· Journal Research of Social Science Economics and Management· Vol 5, pp. 13141-13157· 0 citations
Abstract
PT TML Energy, an Engineering, Procurement, and Construction (EPC) company specializing in solar energy projects in Indonesia, experienced recurring project execution delays of 20–40% beyond planned schedules during 2021–2024. A review of project records indicated that these delays stem not from technical limitations but from systemic weaknesses in project management maturity. This study assesses the current level of project management maturity and develops a tailored Project Management Maturity Model to improve execution performance. A mixed-methods approach was applied: qualitative semi-structured interviews with four key informants explored why delays occur, while a quantitative questionnaire of twenty respondents measured maturity across seven PMBOK Knowledge Areas using Crawford’s (2014) Project Management Maturity Model. The qualitative analysis produced seven Knowledge-Area themes and identified five interconnected root causes of delay: absence of integrated pre-project planning, reactive and fragmented procurement, experience-dependent scheduling, informal communication, and absence of organizational learning. While the questionnaire placed the company at Level 4 (mean = 3.86), triangulation with interview evidence revealed a self-assessment inflation of approximately 1.3 levels, indicating an operational maturity at the upper boundary of Level 2. Five integrated business solutions were developed: an Integrated Project Management Plan template, a procurement lead-time integration framework, a parametric schedule database, a communication management plan template, and a lessons-learned database with a competency development framework. The findings demonstrate that single-method maturity assessments tend to overstate maturity, and that mixed-methods triangulation produces a more accurate and actionable maturity profile for emerging-market EPC contractors.
This study aimed to develop and validate a knowledge-sharing model for project management in project-based organizations, with particular emphasis on power-plant engineering, procurement, and construction projects. This applied study employed a sequential exploratory mixed-methods design comprising qualitative and quan...
Fariba Jamali, M. Aghdasi, Hamid Esmaeeli· Journal of Technology in Ent...· 0 citations
Project delays remain a major challenge in retail development projects, particularly when project planning relies on conventional scheduling approaches that fail to capture activity interdependencies and uncertainty. This study aims to evaluate project scheduling performance in the New Store Concept Development project...
Wildan Karim Anggaperbata, Ahmad Hidayat Sutawidajaya· Technium· 0 citations
Construction companies need both planning/control and flexibility, but practical readiness for hybrid project management is still unclear. This study analyzes readiness for hybrid project management adoption in a small Romanian construction-company context using two questionnaire datasets: a hybrid project management q...
Marius-Valentin Drăgoi, Dragoș-Oliviu Șerban, C. Cristoiu et al.· Buildings· 0 citations
Sustainable building projects require quality management approaches beyond inspection, documentation, and technical compliance. Although Total Quality Management (TQM) is widely studied in construction and organizational performance contexts, its contribution to sustainable building delivery remains fragmented. This st...
Resource allocation in Agile software development is often performed reactively, limiting the ability of project managers to evaluate the impact of changing requirements, workload fluctuations, resource availability, and task dependencies before decisions are implemented. Existing project management tools provide visib...
Syfa Nur Lathifah, Elvira Lailatuth Thohiroh· International Conferences on...· 0 citations
This study examines how Agile Project Management (APM) practices affect the performance of event planning firms in Sri Lanka. The event planning industry involves high uncertainty due to fluctuating client demands, complex logistics, and strict budget constraints. Conventional project management approaches may contribu...