Abstract
Owner Estimate (OE) determination in Engineering, Procurement, and Construction (EPC) projects remains a challenging process due to high levels of uncertainty arising from technical complexity, market fluctuations, incomplete information, and project-specific risks. Although Monte Carlo Simulation (MCS) can generate probabilistic cost estimates through percentile distributions, it does not provide a systematic mechanism for selecting the most appropriate percentile as the final OE. This study aims to develop a risk-based decision framework that integrates probabilistic estimation and multi-criteria decision-making approaches to support a transparent and objective OE percentile selection process. The research applied a combination of Monte Carlo Simulation to generate percentile-based alternatives, the Delphi method to identify and weight relevant decision criteria based on expert consensus, and PROMETHEE II to rank alternative OE percentiles. The results demonstrate that the proposed framework effectively transforms probabilistic outputs into structured decision alternatives by considering technical, economic, and organizational factors. Among the evaluated alternatives, P80 achieved the highest PROMETHEE II net flow value (? = 0.508), indicating its superior balance between risk mitigation and cost efficiency. The findings confirm that OE selection should not rely solely on statistical confidence levels or managerial judgment but requires an integrated analytical approach. This study concludes that the proposed framework provides a transparent, reproducible, and risk-based decision model to improve consistency and reliability in EPC project cost estimation.
The X–Y Platform subsea pipeline owned by PT PHE OSES has been operating beyond its design life and has experienced significant degradation, as evidenced by 17 leakage incidents and the installation of nine repair clamps over the past five years. This condition requires strategic asset management decisions that conside...
Retsa Anugrah Menteng, Tri Joko Wahyu Adi· Journal of social research· 0 citations
Industrial construction projects involve complex interactions among uncertainty, risk, schedule, and cost, motivating the development of advanced analytical and decision-support methodologies. This study systematically reviews methodological approaches to risk assessment and performance management in industrial constru...
Cemil Turan, Maksat Kalybek, Aigul Zhasmukhambetova et al.· Mathematics· 0 citations
Engineering, Procurement and Construction (EPC) projects play a pivotal role in infrastructure and industrial development in Nigeria but continue to experience significant schedule delays and cost overruns arising from engineering complexity, procurement uncertainty, macroeconomic volatility, and regulatory constraints...
A. Adeodu, T. Ojo, Margaret Emmen Ogunbiyi· ABUAD Journal of Engineering...· 0 citations
Oil and gas construction projects (O&GCPs) are among the most complex and high-stakes endeavors in the world. In the UAE, these projects operate under demanding safety and regulatory environments, yet persistent risk-related disruptions continue to undermine project performance. Existing risk management frameworks rare...
Raghad Almashhour, Abroon Qazi, M. K. Al-mhdawi· Frontiers in Built Environme...· 0 citations
Public-sector organisations must often commit to AI adoption decisions before longitudinal performance data are available to inform them. This study introduces and preliminarily demonstrates a Delphi–PERT–Monte Carlo framework for probabilistic KPI estimation in public-sector AI projects, applied to Kazakhstan’s e-gove...
R. Ismailova, N. Ibadildin, A. Kadyrova et al.· Systems· 0 citations