The Improved Grey Wolf Optimization (IGWO) algorithm is proposed to enhance exploration and convergence efficiency and show that IGWO achieves better job sequencing with reduced make-span, lower production cost, and improved resource utilization compared to standard GWO.
Abstract
This research proposes a study on AI-assisted optimized Job-Shop Production System (JPS) to improve performance, reduce cost and time, and detect machine failure. In the current industrial landscape, optimizing Job Shop Production Systems (JPS) is critical for achieving higher efficiency, reduced costs, and improved resource utilization. This study presents a comprehensive review of both conventional and artificial intelligence (AI)/machine learning (ML)-based approaches applied to JPS, with particular emphasis on job sequencing and machine failure prediction. The system is modeled as a multi-stage job-shop with diverse tasks and constraints, highlighting challenges in sequencing, resource allocation, and machine reliability. This work addresses job-shop scheduling in a T-shirt manufacturing system using Grey Wolf Optimization (GWO). While conventional GWO provides feasible job sequencing, it suffers from premature convergence. An Improved Grey Wolf Optimization (IGWO) algorithm is therefore proposed to enhance exploration and convergence efficiency. Simulation results show that IGWO achieves better job sequencing with reduced make-span, lower production cost, and improved resource utilization compared to standard GWO.
Experimental results show that the improved algorithm achieves an optimal Makespan value of 190 in dynamic disturbance scenarios and exhibits strong robustness, providing an efficient and feasible solution for job shop scheduling in complex production environments.
Jianguo Du, Chengkun Li, Zijie Tang· ITM Web of Conferences· 0 citations
With the rapid advancement of distributed manufacturing, distributed flexible job shops have become an important production paradigm in high-end equipment manufacturing. However, dynamic job arrivals and preventive maintenance requirements arising from continuous equipment degradation create strong coupling between p...
Xin Yang, Xiao-Ying Yang, Jin-Hao Du et al.· Journal of Computational Des...· 0 citations
: The hybrid flow shop scheduling problem (HFSP) is a widely used model for energy-efficient multi-stage manufacturing, yet semiconductor studies rarely combine discrete assembly and packaging, batch burn-in processing and speed-adjustable testing within a single four-stage formulation. Most also treat energy consumpti...
Quanh Thi Hoang Vo, P. Phan, H. T. Nguyễn· Computers, Materials & C...· 0 citations
An integrated intelligent decision-making framework that couples machine learning with multi-objective optimization (MOO) to achieve eco-efficient production scheduling is proposed, enabling up to a 17% reduction in CO₂ emissions while sustaining over 95% of maximum production capacity.
Zhen-Guang Shao· Journal of Manufacturing Eng...· 0 citations
Experiments show that the adaptive feedback multi-start variable neighborhood search (AFMS-VNS) algorithm outperforms five comparison algorithms in terms of inverted generational distance, hypervolume, and set coverage when solving the EHFSP-DMT.
Yan Wang, Ya-Bo Wei, Huanli Zhao et al.· Mathematics· 0 citations
We use cookies to run the site and, with your consent, for analytics and to show ads.
See our Cookie Policy.