Skip to content
Open access

Risk Management Analysis in the Implementation of the Mataram Mayor's Office Development Project

Aug 2026 · Eduvest - Journal Of Universal Studies · Vol 6, pp. 8842-8853 · 0 citations · 19 references

Abstract

In the implementation of construction projects, particularly the Mataram Mayor's Office Development Project, various risks may lead to cost overruns, delays in project completion, and reduced work quality. During the construction phase, contractors face various uncertainties; therefore, effective risk management is required. This study aims to identify risk sources, conduct risk assessments, and formulate risk mitigation strategies. The method employed in this study is the Risk Breakdown Structure (RBS) for risk identification and the AS/NZS 4360:2004 standard for determining risk levels and categories. The identification results revealed that 44 risk variables were identified in the project. Following the risk assessment, 6 risks were categorized as high risk, 30 risks as medium risk, and 8 risks as low risk. Risk management strategies are implemented through monitoring and supervision to strengthen supply chains, manage logistics, and ensure preparedness in addressing uncertainties such as delays and material shortages. Furthermore, improving work culture, implementing Occupational Health and Safety Management (OHSM), applying systematic change management, enhancing effective communication, and developing adaptive weather planning are key measures to minimize risks and maintain project continuity.

Read PDF

Similar papers

Open access Sep 2026

RISK MANAGEMENT ANALYSIS USING THE 5×5 RISK MATRIX METHOD (MIL-STD-882B)

Project risk management involves a systematic approach to planning, identifying, analysing and responding to potential risks throughout project implementation. This study iaims to identify, evaluate and develop appropriate  risk reduction strategies for the Slinga Kiri Irrigation Area project in Purbalingga Regency. In...

S. Putri, N. A. S. Purwono, Diyah Ayu Widayanti · 0 citations
Review Open access Sep 2026

Evaluating Risk Management Practices in the Lagos Ibadan Motorway Reconstruction Project

Large-scale infrastructure projects in developing countries remain highly exposed to uncertainty, and inadequate risk management continues to contribute to delays, cost overruns and quality shortfalls. This study evaluates risk management practices on the Lagos–Ibadan Motorway reconstruction project in Nigeria, focusin...

Abiodun Saheed Olaniyan, Odunayo Rofiyat Olaniyan · 0 citations
Review Open access Aug 2026

EFFECTS OF RISK MANAGEMENT ON THE PERFORMANCE OF WORLD BANK-ASSISTED PROJECTS IN DELTA STATE, NIGERIA

World Bank-assisted development projects continue to face performance challenges such as cost overruns, quality shortfalls, stakeholder dissatisfaction and schedule delays, despite the Bank's comprehensive risk management frameworks. This study examined the effect of risk management - specifically risk identification,...

Chukwuka Godwin Ubaka, H. Nwoke, U. Duru · 0 citations
Conference Open access 2022

Project risk factors leading to construction cost overruns

Most of the construction projects fail to be completed within cost and time. This study aimed to assess the project risk factors that lead to construction cost overruns. The study employed a quantitative research approach. A purposive sampling technique was used to source data from a sample size of 50 respondents. A su...

M. Tshehla · 0 citations
Conference Open access 2022

An assessment of risk factors impacting cost variability in Nigerian construction projects

According to a review of different authors' work, there are numerous risk factors that could impact the final account sums (FAS) of construction projects, causing variations in contract sum (CS). By minimising the variability between the final account sum FAS and CS, a compelling risk study could help resolve this issu...

Babatunde Dosumu, O. Ejohwomu, Akilu Yunusa Kaltungo et al. · 0 citations
Open access Aug 2026

Integration of Cost of Quality and Risk Analysis to Reduce Failure Costs in the KIIC Margakarya 150 KV Substation Civil Engineering Project

Quality failures in construction projects increase costs through failure costs, which are primarily driven by project implementation risks. Quality cost management and risk management are often conducted separately, resulting in limited integration for decision-making, particularly in civil construction projects within...

R. Wicaksono, Farida Rachmawati · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.