Skip to content
Open access

Universal planning errors: from a typology to a working tool for the project manager

Oct 2026 · Journal of Project Management · Vol 2, pp. 44-56 · 0 citations · 17 references

Abstract

This article is devoted to universal mistakes of planning, that arise during the work on a project. Inconsistencies between project planning documents arise in the first days of a project and recur regardless of industry, scale or planning technique, yet stay invisible when a document is read alone: each follows its own rules, while the inconsistency lies between them and requires a rarely mandated cross-check. The aim of the study is to build an analytical frame for reading a set of planning documents along three dimensions — technical, user and commercial and turns it into a working tool for project managers. The frame is derived from the three IPMA ICB 4.0 competence areas and the three PMI Talent Triangle categories and is claimed as an original development. The empirical base of the study is twenty team sets of planning documents from two master’s cohorts: the typology was built on the ten 2026 sets and tested independently on the ten 2025 sets, collected a year earlier. Seven universal errors are identified with their degree of impact. The two cohorts showed similar errors; four of the seven occur in at least seven sets of each. The cost estimate diverges from the other documents in two opposite ways, depending on whether a numerical budget limit is stated. The frame becomes a checklist separating machine checks from the project manager’s decisions.

Read PDF

Similar papers

Conference Sep 2026

From Concept to Tool: Cross-Disciplinary Focus Groups on Modular Research Processes

The Modular Research Processes (MRP) framework represents research methodology as a modular, layered composition of products (artifacts of the research process) and procedures (actions that produce and relate products). Thus, methodology can be communicated and reused rather than left buried in prose and code. This pap...

Steffen Strohm, Alicia Martín-Navarro, J. Medina-Garrido et al. · 0 citations
Review Open access Sep 2026

End-to-End Planning as a Tool for Synchronizing Participants in a Large Project

This study examines through planning (also referred to as end-to-end planning) as a structural mechanism for achieving systematic coordination among multiple participants in large and complex projects. Despite decades of methodological advancement in project management, the failure rate of large-scale initiatives remai...

Nikolaev Denis · 0 citations
Review Open access Oct 2026

Design Science Research Approach to Metric-Based Onboarding Progress Monitoring in Software Teams

Onboarding in software teams requires the simultaneous acquisition of technical, domain, and organisational knowledge, while the progress of new employees is often monitored through informal and “difficult-to-compare” assessments. This paper presents an integrated, metric-based model for recording and reviewing indicat...

I. Vecštejn, Ž. Stojanov, D. Dobrilović et al. · 0 citations
Conference Open access Sep 2026

Aligning a Digital Project Management Tool with People, Process and Technology: Evidence from Trondheim Cathedral School

The construction industry is under pressure to digitalise. This paper examines how carpenters and white-collar staff on a major Norwegian building project tested a digital project management tool and how usage could improve production. The study uses a qualitative single-case design at the Trondheim Cathedral School pr...

Siri Elise Larsen, O. Lædre, J. Lohne · 0 citations
Review Open access Nov 2026

A Systematic Review on Complexity in Collaborative Infrastructure Projects

Projects in the infrastructure sector are becoming increasingly interdependent and complex, and how to deal with that complexity is something to pay close attention to in the process of developing a sustainable society. This article sets out to provide an overview of how complexity is dealt with in real projects and th...

Oddrun P. Røsok, M. D. de Bruijne, W. Veeneman · 0 citations
Conference

Lean as a basis for change

In the context of the recent takeover of Atmus and the change of corporate name, I lead a project focused on the implementation of the 5's methodology and the creation of a visual factory environment in the production and office areas. This project responds to the need to update the visual identity of the company, adap...

Rogelio Portillo, S. Tello · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.