Question: How can Lean Construction principles, and Value Stream Mapping (VSM) in particular, be applied to visualize and improve the façade engineering delivery process?
Purpose: The purpose of this study is to develop and apply current-state and future-state Value Stream Maps to the façade engineering delivery process to identify sources of workflow inefficiency and propose Lean-based improvements.
Research Method: The study applies a Design Science Research approach to a representative façade engineering case, combining semi-structured interviews with 15 international façade experts and a systematic literature review to define process phases and consultant–contractor interfaces, and develop current and future-state VSMs.
Findings: The current-state VSM reveals significant inefficiencies related to fragmented communication, late contractor involvement, design rework, approval delays, and information handoff discontinuities. The future-state VSM demonstrates that early contractor involvement and digital collaboration platforms can substantially reduce workflow fragmentation and non-value-added activities, with expert informed estimates indicating up to a 60% reduction in non-value-added time.
Limitations: The VSM was developed using a generic façade case and expert judgment rather than project-specific quantitative data; therefore, the results indicate potential improvements requiring empirical validation.
Implications: The study demonstrates that Lean principles and VSM can be effectively adapted to engineering intensive, iterative delivery processes, extending their application beyond traditional linear construction workflows.
Value for practitioners: The proposed VSM framework enables façade stakeholders to visualize workflows, diagnose delays and rework, and improve coordination, predictability, and delivery performance.
Keywords: Lean Construction, Value Stream Mapping, façade engineering, workflow variability, early contractor involvement, process optimization.
Paper type: Full paper
This study aims to address the strategic gap in Building Information Modeling (BIM) implementation by developing and empirically validating a novel, process-based framework (BEP-V) that embeds Value Engineering (VE) directly into the BIM Execution Plan.
The framework was empirically validated through a real-...
Mohammed Mahmood Alghuriby, A. M. Alawag· Journal of Engineering, Desi...· 0 citations
This study aims to design a business process for managing engineer competencies through certification and to improve the effectiveness of monitoring and evaluation of capacity building in partnership programs at PT XZY. The method used is a qualitative approach through desk study, interviews, and focus group discussion...
Anjar Prabowo, L. Kurniawan, R. Purnomo· The International Conference...· 0 citations
Construction projects experience frequent changes that significantly impact time performance. Existing change control systems remain fragmented and lack integration with digital technologies. Throughout the construction project lifecycle, dynamically occurring changes require structured and easily accessible informatio...
Widya Apriani, Yusuf Latief, L. S. Riantini· Journal of Project Managemen...· 0 citations
Variations in construction projects pose a significant challenge to achieving successful project outcomes. Lean Six Sigma has the potential to manage variations in the construction industry. This study aims to explore the fusion of lean Six Sigma (LSS)–Define, Measure, Analyze, Improve, and Control (DMAIC) tools and...
Thalpawila Withana Kankanamge Nethma Shashini, J. Jayanetti, V. Disaratna et al.· Journal of Legal Affairs and...· 0 citations