Jul 2026· JURNAL TEKNIK SIPIL CENDEKIA (JTSC)· Vol 7, pp. 471-481· 0 citations
TL;DR
Machine Learning has great potential in supporting early warning systems and data-driven decision-making to control the risk of project cost overruns and is concluded to produce higher levels of accuracy than traditional statistical methods or single ML models.
Abstract
Cost overrun is one of the main problems in project management that has a significant impact on the success of construction projects. High project complexity, uncertainty of field conditions, design changes, and external factors such as inflation and supply chain disruptions make predicting cost overruns a challenge that requires a more sophisticated analytical approach than conventional methods. The development of Machine Learning (ML) technology has opened new opportunities to improve the accuracy of project cost predictions through the use of historical data and complex pattern analysis. This study aims to review the development of research related to the application of Machine Learning in predicting project cost overruns, identify the most widely used algorithms, influential predictor variables, and evaluate the advantages and limitations of each approach. The research method is carried out through a systematic literature review of scientific publications indexed by Scopus in the period 2015–2025. The study focuses on various ML algorithms, including Artificial Neural Network (ANN), Support Vector Machine (SVM), Random Forest (RF), Decision Tree (DT), Gradient Boosting, and Extreme Gradient Boosting (XGBoost), which are used in project cost prediction. The study results show that Random Forest and XGBoost to produce higher levels of accuracy than traditional statistical methods or single ML models. This study concludes that Machine Learning has great potential in supporting early warning systems and data-driven decision-making to control the risk of project cost overruns.
The findings indicate that gradient-boosted ensembles are the most robust default for heterogeneous construction data, and that machine learning can already serve as an effective delay-triage tool using routinely archived administrative records — a practice directly transferable to public project governance in developi...
Mustafa Al-Saadi· International Journal of Com...· 0 citations
Cost overruns are commonly occurred in construction project. Single prediction model always has low accuracy and generalization ability. It is hard to explore complex cost risk factors accurately. This paper develops an ensemble machine learning model based on stacking strategy to solve the problem. Firstly, collect da...
Cost overrun remains a major challenge in construction project management, particularly in regions characterized by geographical constraints, logistical complexity, and high project uncertainty. Conventional statistical approaches often struggle to capture nonlinear relationships among factors associated with construct...
J. Anggawan, A. Irawan, M. Waty· Infrastructures· 0 citations
Irrigation projects are essential for ensuring water security and sustainable agricultural development; however, they are highly susceptible to human, managerial, equipment, and environmental risks that contribute to cost overruns and schedule delays. Although machine learning (ML) has been widely applied to project pe...
Abbas Ali, Hatim Abd Al-Karim· Research on Engineering Stru...· 0 citations
The construction industry has always been plagued by a high number of uncertainties; due to this, cost overruns are the most frequent challenge. To address this problem, this study aims to determine how the presence of risk increases the likelihood of cost overruns and to develop a predictive model that can help re...
Syed Muhammad Yasir Ashrafi, Rizwan U. Farooqui, Mohamed Latheef et al.· Journal of Engineering, Desi...· 0 citations
Precision in estimating the contingencies in project parameters has been difficult in Nigeria despite the numerous available computational techniques. This study aims at exploring the predictive ability of artificial neural network with a view of designing prediction models and ascertaining efficiencies. Secondary data...
Momoh Ohiomah Oboirien· Construction Business and Pr...· 0 citations