the Analysis Of Overall Equipment Effectiveness On The Heading Machine To Minimize Six Big Losses Using The Total Productive Maintenance Method: A Case Study Of PT XYZ
Aug 2026· Journal of Industrial Engineering and Halal Industries· Vol 7, pp. 11-16· 0 citations
Abstract
Abstract
Machine efficiency and productivity are key factors in the manufacturing industry to ensure product quality and smooth production processes. PT XYZ, as a company engaged in manufacturing, faces challenges in optimizing the performance of its Heading machine used during the production process. One of the identified problems is the high downtime, which averages 5,509.7 minutes per month during the research period. This study applies the Overall Equipment Effectiveness (OEE) and Six Big Losses methods to analyze machine effectiveness and designs improvement recommendations through the Total Productive Maintenance (TPM) approach. Data collected over a six-month period, from January to June 2024, shows that the Heading machine has an availability rate of 86.63%, a performance rate of 87.93%, and a quality rate of 99.55%, resulting in a total OEE value of 75.5%. The Six Big Losses analysis indicates that the main factor affecting machine effectiveness is reduced speed losses. Therefore, this study recommends the implementation of TPM to improve the effectiveness of the Heading machine performance at PT XYZ.
Low machine effectiveness can reduce production efficiency through equipment failures, lengthy setup activities, speed losses, and product defects. Previous studies have generally examined machine effectiveness and lean manufacturing separately, leaving limited discussion of their integrated use to identify operational...
Roma Wibero, Hernadewita· Greenation International Jou...· 0 citations
This study evaluates the effectiveness of heavy earth-moving machinery, specifically shovels and draglines, at the West Lignite Coal Mine in Turkey, using Overall Equipment Effectiveness (OEE) and the Production Equipment Effectiveness (PEE) for the first time. The primary objective is to enhance production rates, impr...
Merve Karaabat Varol· Konya Journal of Engineering...· 0 citations
This study was conducted to evaluate the level of effectiveness of the NPK 2 Bagging facility at PT XYZ through the application of the Overall Equipment Effectiveness (OEE), Six Big Losses, and Failure Mode and Effect Analysis (FMEA) methods. The data taken is facility data during the January-July 2026 period. OEE is u...
Moch Diva Widya Prasetya, Muhammad Zainuddin Fathoni, M. Hardiyanti· International Journal of Sci...· 0 citations
Inventory control is an important aspect in maintaining the continuity of the production process and minimizing a company's operational costs. Ineffective inventory management may lead to stock shortages or excess inventory, both of which can increase operational costs. Cafe Hoolu Burger is a food and beverage business...
Arief Cahyo Wibowo, Farida Djumiati Sitania, W. Tambunan· Jurnal Teknik Industri· 0 citations
Within the textile manufacturing value chain, spinning mills occupy a strategically critical position; however, persistent operational inefficiencies including output delays, excessive inventory holding, and underutilized equipment frequently hinder performance. This study evaluates the effectiveness of the production...