Skip to content
Review Open access

Desain dan Pengembangan Sistem Informasi Manajemen Proyek Berbasis Web di Apotek Cemara

Aug 2026 · Jurnal Ilmu Komputer dan Sistem Informasi · Vol 5, pp. 779-792 · 0 citations · 10 references

TL;DR

Results demonstrated that the Laravel- and MySQL-based system enhanced transparency, reduced administrative errors, and improved efficiency by up to 30%, with user evaluations highlighting interface ease and multi-platform accessibility.

Abstract

Project management at Cemara Pharmacy faced challenges such as poor team coordination, progress monitoring difficulties, and data inaccuracies, hindering operational efficiency in the pharmaceutical sector. This study aimed to design and develop a web-based project management information system to support real-time planning, execution, and evaluation of projects. The research employed the Waterfall model, with data collection via field observations, interviews with managers and staff, document analysis, and literature review; the population comprised Cemara Pharmacy staff as primary participants, using UML (Use Case, Activity, Sequence, Class Diagrams), WBS, Gantt Chart, and PERT as instruments; data analysis involved functional, integration, and User Acceptance Testing (UAT). Results demonstrated that the Laravel- and MySQL-based system enhanced transparency, reduced administrative errors, and improved efficiency by up to 30%, with user evaluations highlighting interface ease and multi-platform accessibility. The study concludes that the system significantly contributes to professional project management in pharmacy SMEs, implying broader operational digital transformation.

Read PDF

Similar papers

Review Open access Oct 2026

Perancangan Sistem Informasi Pendataan dan Pengelolaan Surat Izin Memegang Senjata Api Berbasis Web pada Deputi Pemberantasan BNN RI

This research aims to design and develop a web-based information system for the data managemen and administration of Firearm Possession Permits (SIMSA) for the Deputy for Eradication at the National Narcotics Agency of the Republic of Indonesia (BNN RI). The study was motivated by the fact that SIMSA recording and arch...

Hery Purwanto, S. Tarigan, Sakius Tarigan Shirlyani · 0 citations
Open access Aug 2026

Pengembangan Sistem Informasi Pelaporan Perjalanan Dinas Menggunakan Metode Rapid Application Development (RAD)

Microsoft Excel is still utilized by the Department of Cooperatives, Small and Medium Enterprises, and Trade (DISKUMDAG) of Landak Regency as the primary tool for data management and official travel reporting. This condition leads to difficulties in data retrieval and updating, risks of errors in cost calculation and d...

Nolly Pialewi, Rudy Hartono · 0 citations
Open access Oct 2026

EVALUASI PENERAPAN SISTEM PELAYANAN IZIN TERPADU PRAKTIK PENDIDIKAN DAN KEGIATAN (PITANTIK) DENGAN MODEL CIPP DI DINAS PENDIDIKAN KOTA SEMARANG

This study aims to analyse the implementation of PITANTIK using the Context, Input, Process, Product (CIPP) evaluation model. The study employs a qualitative, descriptive approach. Data were collected through interviews, observations, and documentation. The study used purposive sampling with five informants and analyse...

Hasna Hauna Rachmani, Tusyanah · 0 citations
Open access Sep 2026

Pengembangan Sistem Informasi Pelayanan Pengaduan Masyarakat di Desa Bangbang Berbasis Website

This study aims to develop a web-based Community Complaint Service Information System in Bangbang Village, Bali, to overcome documentation problems and improve the efficiency of the conventional complaint mechanism. The existing process faced limitations in complaint recording, data management, and monitoring, resultin...

I. G. K. Harta, I. P. A. S. Putra, I. M. Y. Sadewa · 0 citations
Open access Aug 2026

Pengembangan dan Evaluasi Sistem Informasi Peminjaman Barang Berbasis Google Apps Script

Item-loan administration in one subdivision still relies on physical handover forms and non-centralized records, making loan status and history difficult to trace. This study developed and evaluated an item-loan information system based on Google Apps Script. The study applied the Waterfall model, covering requirements...

Albert Michael Putra Yochanan, S. Jatmiko · 0 citations
Review Open access Aug 2026

Pengembangan Sistem Informasi Magang Berbasis Web Dengan Panduan Document Management System (DMS)

This study developed and refined a web-based internship management information system with a Document Management System guide using PT PLN (Persero) Unit Layanan Pelanggan Palembang as a case study. The study addressed direct document submission, manual verification, limited status monitoring, and repeated explanations...

Gilang Bayu Wardana, Nyimas Sopiah · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.