The assembly line balancing problem (ALBP) is an optimization problem which involves assigning tasks to stations to maximize line efficiency. In the context of Industry 4.0, assembly lines must be flexible and adaptable to stochastic and real-world conditions. However, in the literature, line balancing is mostly studied in deterministic environments. As a result, this paper presents a robust optimization approach to bridge the gap between theory and practice by addressing a real-world ALBP in the furniture industry. A mixed integer programming (MIP) model is proposed, considering uncertainty in task execution times, which are expressed as intervals of possible values, and the sequence of module assembly in addition to the standard ALBP constraints. Then, it is linearized by duality to be solved by Gurobi. Two objectives, (1) cycle time minimization and (2) tool efficiency, are optimized lexicographically using the proposed MILP models. Computational experiments and Monte Carlo simulations demonstrate that robust solutions outperform deterministic ones, ensuring stable throughput under variability. The study highlights the trade-off between efficiency and robustness, offering practical insights for furniture manufacturers.
The shipbuilding industry involves complex assembly processes where multiple subassemblies must be scheduled and integrated into larger blocks under strict precedence constraints. These activities are executed in parallel across constrained workspaces, making efficient scheduling critical to meeting deadlines and avoid...
J. Pernas-Álvarez, Hyungjoo Cha, Jeong Hoon Kim· MATEC Web of Conferences· 0 citations
Peak power limits restrict concurrent tasks and may increase assembly-line cycle time. To the best of our knowledge, this study is the first to minimize cycle time for the simple assembly line balancing problem type 2 (SALBP-2) with a fixed number of workstations and a fixed limit on total instantaneous power. An exact...
Gia-Ho-Ang Bao, Tuyen Van Kieu, Khanh Van To· 0 citations
ABSTRACT In the construction industry, lattice joists (final items) are precast structures that combine a steel truss and a concrete base. Their production is based on a client’s order that specifies the quantity, length, and deadline for delivery. A process manager uses this information to create a weekly production p...
Caroline de Arruda Signorini, S. D. de Araujo, R. Jans· Pesquisa Operacional· 0 citations
This paper solves the scheduling problem of identical parallel machines with tooling and pallet–fixture constraints in a high‐mix, low‐volume, high‐complexity manufacturing environment. The machines are connected through an automated material handling device and in‐between buffer places that allow for autonomous prod...
Koen Herps, Quang-Vinh Dang, Tugce G. Martagan et al.· International Transactions i...· 0 citations
: The hybrid flow shop scheduling problem (HFSP) is a widely used model for energy-efficient multi-stage manufacturing, yet semiconductor studies rarely combine discrete assembly and packaging, batch burn-in processing and speed-adjustable testing within a single four-stage formulation. Most also treat energy consumpti...
Quanh Thi Hoang Vo, P. Phan, H. T. Nguyễn· Computers, Materials & C...· 0 citations
This study addresses a large-scale location–allocation problem in a three-echelon automotive supply chain comprising 382 suppliers, candidate distribution centers, and six assembly plants. The planning task is to redesign the inbound consolidation network while minimizing transportation and distribution center operatin...