Skip to content
Review Open access

Risk-Based Contingency Cost Analysis Using the Expected Monetary Value Method

Aug 2026 · Enrichment: Journal of Multidisciplinary Research and Development · 0 citations

Abstract

Construction projects are characterized by high levels of uncertainty that may affect project cost, quality, and schedule performance. Effective risk management is therefore essential to determine contingency costs that adequately reflect project risks. This study aims to identify dominant construction work packages based on risk exposure and estimate risk-based contingency costs for the Main Building Construction Project of the Gianyar Regency Government Center. Project risks were identified through a literature review and Work Breakdown Structure (WBS), validated by experts, and compiled into a risk register. The Probability Impact Matrix (PIM) was used to identify dominant risks, while the Expected Monetary Value (EMV) method was applied to estimate contingency costs for cost (EMVc), quality (EMVq), and schedule (EMVt) aspects. These three aspects were then integrated to determine the overall contingency cost. The results identified ten high-risk work packages, including concrete, reinforcement, steel roof trusses, masonry, sanitary, signage, roof covering, plumbing, road, and softscape works. The EMV analysis produced contingency values of 6.22% (EMVc), 5.95% (EMVq), and 0.70% (EMVt), resulting in an integrated contingency cost of IDR 28.92 billion, equivalent to 12.87% of the project contract value. The findings indicate that contingency cost requirements are primarily influenced by cost and quality risks, providing a more objective basis for contingency reserve allocation during project execution.

Read PDF

Similar papers

Open access Aug 2026

Integration of Cost of Quality and Risk Analysis to Reduce Failure Costs in the KIIC Margakarya 150 KV Substation Civil Engineering Project

Quality failures in construction projects increase costs through failure costs, which are primarily driven by project implementation risks. Quality cost management and risk management are often conducted separately, resulting in limited integration for decision-making, particularly in civil construction projects within...

R. Wicaksono, Farida Rachmawati · 0 citations
Review Open access Aug 2026

Supply Chain Contingency Estimation: Calculation Methods Towards Better Management of Risk and Cost-Overrun

Contingency estimation methods are largely misapplied in the construction industry and currently align inadequately with risk and cost-overrun. The work discussed here addresses this gap, to present a newly developed structured mechanism to help the project-team choose an appropriate calculation method based upon proje...

Survarna Ananthasivan, A. Whyte, S. Urquhart · 0 citations
Conference Open access 2022

An assessment of risk factors impacting cost variability in Nigerian construction projects

According to a review of different authors' work, there are numerous risk factors that could impact the final account sums (FAS) of construction projects, causing variations in contract sum (CS). By minimising the variability between the final account sum FAS and CS, a compelling risk study could help resolve this issu...

Babatunde Dosumu, O. Ejohwomu, Akilu Yunusa Kaltungo et al. · 0 citations
Review Open access Aug 2026

Risk-Based Time Contingency Analysis for Hospital Building Construction Projects Using the Pert (Program Evaluation and Review Technique) Method

The findings demonstrated that risk-based PERT provides a more realistic and adaptive scheduling framework for mitigating delay risks in complex hospital construction projects.

Almira Nabila Ardi, Tri Joko Wahyu Adi · 0 citations
Conference Open access 2022

Project risk factors leading to construction cost overruns

Most of the construction projects fail to be completed within cost and time. This study aimed to assess the project risk factors that lead to construction cost overruns. The study employed a quantitative research approach. A purposive sampling technique was used to source data from a sample size of 50 respondents. A su...

M. Tshehla · 0 citations
Open access Aug 2026

Empirical Analysis of Time-Cost Risk Coupling in Construction Projects using FMEA, Correlation, and Regression Models

Construction project time and cost overruns continue to pose a significant performance challenge, hindering financial viability, delivery certainty, and stakeholder confidence. Although time and cost overruns are common, treating them as separate issues often diminishes the effectiveness of risk mitigation strategies....

Diksha Sanjay Jadhav, A. Katdare · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.