Quantifying and Prioritising Construction Delay Risks in Australia Using the Fuzzy Best–Worst Method and a Probability–Impact Matrix

Aug 2026 · Buildings · 0 citations · 60 references

Abstract

Construction delays remain a persistent challenge in Australian construction projects, contributing to cost escalation, disrupted work sequences, contractual claims, and reduced confidence in project delivery. Although delay causes have been widely investigated, existing studies often provide broad factor lists and prioritise risks using single-dimension or inconsistent scoring approaches. This limits guidance on which delay risks should receive priority attention when project teams face constrained time, cost, and management resources. This study addresses this limitation by quantifying and prioritising 22 validated delay risk factors in Australian construction projects. Probability of occurrence and schedule impact were evaluated as separate judgement dimensions before being integrated into an overall measure of risk criticality. Data were collected from 48 experienced Australian construction professionals. A dual-dimension Fuzzy Best–Worst Method was applied to derive separate ratio-scale weights for probability of occurrence and schedule impact, with dimension-specific consistency screening used to improve judgement reliability. The resulting weights were integrated using a probability–impact formulation and mapped onto a 5 × 5 Probability–Impact Matrix through quantile-based discretisation. A 10,000-iteration Monte Carlo robustness analysis was subsequently conducted to assess the stability of the resulting rankings under alternative expert-selection and weighting scenarios. The results indicate that the delay risks perceived by the participating professionals as having the highest combined probability and schedule impact are predominantly governance-, approval-, and coordination-related, particularly owner late decisions, change-approval delays, owner requirement changes, cost-estimation deficiencies, design-approval delays, and inadequate planning. The Monte Carlo analysis further indicated that the principal risk rankings remained relatively stable under variations in expert aggregation. Overall, the integrated FBWM–PIM framework provides a structured and practically interpretable approach for eliciting and prioritising expert perceptions of construction delay risk and translating them into an actionable classification tool for allocating limited risk management resources.

Read PDF

Similar papers

Review Open access Aug 2026

Localising global construction delay risk factors: an optimisation-enhanced expert consensus framework for the Australian construction industry

This study aims to investigate how globally identified construction delay factors can be translated into a framework that accurately reflects Australian project conditions. It aims to develop a validated set of delay risks by integrating systematic evidence synthesis with expert elicitation and optimisation-based c...

Faranak Zagia, S. Kajewski, S. Omrani et al. · 0 citations
Open access Aug 2026

Empirical Analysis of Time-Cost Risk Coupling in Construction Projects using FMEA, Correlation, and Regression Models

Construction project time and cost overruns continue to pose a significant performance challenge, hindering financial viability, delivery certainty, and stakeholder confidence. Although time and cost overruns are common, treating them as separate issues often diminishes the effectiveness of risk mitigation strategies....

Diksha Sanjay Jadhav, A. Katdare · 0 citations
Review Open access Aug 2026

Risk-Based Contingency Cost Analysis Using the Expected Monetary Value Method

Construction projects are characterized by high levels of uncertainty that may affect project cost, quality, and schedule performance. Effective risk management is therefore essential to determine contingency costs that adequately reflect project risks. This study aims to identify dominant construction work packages ba...

Ni Luh Ayu Ariati, Dewa Ketut Sudarsana, G.A.P. Candra Dharmayanti · 0 citations
Review Open access Aug 2026

Supply Chain Contingency Estimation: Calculation Methods Towards Better Management of Risk and Cost-Overrun

Contingency estimation methods are largely misapplied in the construction industry and currently align inadequately with risk and cost-overrun. The work discussed here addresses this gap, to present a newly developed structured mechanism to help the project-team choose an appropriate calculation method based upon proje...

Survarna Ananthasivan, A. Whyte, S. Urquhart · 0 citations
#artificial intelligence Review Open access Sep 2026

Integrated Time–Cost–Risk Management in Industrial Construction: A Systematic Review and Unified Analytical Taxonomy

Industrial construction projects involve complex interactions among uncertainty, risk, schedule, and cost, motivating the development of advanced analytical and decision-support methodologies. This study systematically reviews methodological approaches to risk assessment and performance management in industrial constru...

Cemil Turan, Maksat Kalybek, Aigul Zhasmukhambetova et al. · 0 citations
Review Open access Aug 2026

Risk-Based Time Contingency Analysis for Hospital Building Construction Projects Using the Pert (Program Evaluation and Review Technique) Method

The findings demonstrated that risk-based PERT provides a more realistic and adaptive scheduling framework for mitigating delay risks in complex hospital construction projects.

Almira Nabila Ardi, Tri Joko Wahyu Adi · 0 citations

We use cookies to run the site and, with your consent, for analytics and to show ads. See our Cookie Policy.